Gas Bypass System

The standpipe and hose-over. Plus the tools to install them.

Parts, specifications, test status and installation for the Proflow Gas Bypass System.

What's in the system

Parts and part numbers.

The system is the standpipe unit and the hose-over. The standpipe comes with the airbag fitted. The tools make the install quicker and more consistent. Each site picks the ones that suit how it installs and treats holes.

ItemPart numberUsed for
System
Standpipe unit 96 mmPF-GBS-SP-96-100050 mm standpipe with the airbag fitted. Seals the hole.
Hose-over 50 mm × 15 mPF-GBS-HO-50-15000Joins the two standpipes across the intersection.
Installation tools
Grout tampPF-ACC-GT-1500Scraping out the hole and hand grouting.
Grout lance (reusable)PF-ACC-GL-1000Pumped grout.
Foam lance (single use)PF-ACC-FL-1000Silent Seal.
Hole plug (wedge) 96 mmPF-ACC-HP-96-64Fits over the standpipe hose to close off the hole. Used with the grout and foam lances.
Regulated inflator with 7 m hosePF-ACC-INF-7000Inflating the airbag.

Specifications

PF-GBS-SP-96-1000
Hole
96 mm
Drilled diameter
Standpipe
50 mm
Earth lead to a rib bolt or nominated earth point
Airbag
60 psi
Regulated inflator PF-ACC-INF-7000
Common sealants
Hand grout
Cougar Mine Grout Fast Set or High Yield
Pumped grout
Minova FB400 or Cougar Mine Grout High Yield
Borehole sealant
Minova Silent Seal

Commonly approved on mine sites for gas drainage holes. Or use any product your site has approved.

LimitNot for holes over 110 mm in diameter.

Test status

Component Standard Report Result
Hose 51 mm (standpipe and hose-over) AS 2660-1991 fire resistance and antistatic BPI-24-0192 PASS
Air line 1/4 in (standpipe and inflator) AS 2660-1991 fire resistance and antistatic BPI-24-0178 PASS
Air regulator body (inflator) Aluminium LM24. Mg + Ti 0.23% Material data DATA
Airbag Testing in progress Pending PENDING

Hoses tested by BPI Technologies in NSW.

Installation

Installing it

The full procedure will be available once it's issued.

  1. 01Scrape the hole out with the grout tamp once it's under supported ground.
  2. 02Push the standpipe into the rib.
  3. 03Inflate the airbag to 60 psi with the regulated inflator.
  4. 04Do the same on the other side. Then join the two standpipes with the hose-over.
  5. 05Treat the hole as your site's borehole intersection process calls for. Hand grout with the tamp or pump grout through the grout lance. For Silent Seal use the foam lance.

Talk to us about your site.

Get in touch to talk about how we can help your site control gas and keep mining. We'll keep you posted as testing comes through.

Get updates